Architect/Builder:

 Sundberg Construction Co.

Contractor:

 

Original Owner / Dates of Occupancy:

 Bishop Toolen / 1928-present

Subsequent Owners / Dates of Occupancy:

Archbishop Lipscomb

Archbishop Rodi

 

 

 

Physical Condition:

(excellent, good, fair, poor, ruinous)

 excellent

Remaining Historic Materials: (high, medium, low)

 

Historic Use of Property:

 High School

Current Use of Property:

 High School

Number of Stories:

 Two

Exterior Historic Construction/structural Material(s):

(brick, concrete, log, metal, stone, stucco, woodframe, other.)

 Concrete block stucco

Current Exterior Covering: 

(asbestos, brick, concrete, log, metal, stone, stucco, vinyl, wood siding, other.)

 Concrete block stucco

Roof Configuration:

(gable, flat, hip, mansard, pyramidal, shed.)  

 Wood truss, wood deck

Tile, clay

Roof Finish Materials: 

(asphalt, built-up, composite, metal, slate, tar, tile, wood, other, or unknown).

 Carpet and underlay

Tile, ceramic

Foundation Material: 

(brick, concrete block, poured concrete, stone, wood, other or unknown).   

 Continuous wall

Window Type:

(awning, casement, double hung, fixed, hopper, and jalousie)

 

Window materials:  

(metal, synthetic, and wood)  

 wood

Interior Materials:

Wall finishes (e.g. plaster, plank, beadboard), ceiling finishes (e.g. plaster plank, beadboard), floors (plank, tongue and groove, linoleum), etc.

Acoustical ceiling, suspende

Plaster and furring

wood

Interior Details:

(stairs, fireplaces, mantels, doors, molding, built-in furniture, etc.)

stairs

Number and Type of all Outbuildings:

(barn, garage, gazebo/summerhouse, shed, storm shelter.)